We installed two hatches in the rooms of the non-return valves of the main pump of the Tallinn wastewater...
We installed two fiberglass ladders in the cable pits of Rail Baltic. Fibreglass ladders for cable pits...
We installed a protective bath in the galvanize industry. For this we used PPH material to protect the...
Anti-slip fiberglass coverings from M.M. S.r.l. installed on the school’s stairs and ramps now ensure...
We installed FRP closed grates covered with sand in the Vardi sewage pump. We cut holes for pipes and...
We supplied GRP grates on FRP legs to protect the hydraulic pipes in Paldiski. GRP grates ensure safety...